Puriton Rail Bridge
Bridge Name: | Puriton Rail Bridge | |||
No.: | 5 | |||
Location: | ||||
Build Date: | 1942 | |||
Engineer: | Mr J.M.Hitchen M.I.C.E. M.I.M.E Deputy Chief Engineer to the Somerset River Catchment Board | |||
© Copyright somersetrivers.org |
||||
Description: | ||||
Five spans-one 50ft main steel span and two 16ft spans of reinforced concrete, carried on reinforced concrete piles, driven through the soft clay and peat beds to rock lying at a depth of 80 ft below railway track level; the piles are 65ft in length, and each weighed about 7.5tons. | ||||
References: | Capture Highbridge – Drainage of the Brue Valley |