Black Hut Bridge – Canal Bridge No.19
|
|
||||
![]() |
||||
| Bridge Name: | Black Hut Bridge – Canal Bridge No.19 | |||
| No.: | 23 | |||
| Location: | ||||
| Build Date: | 1991 | |||
| Engineer: | Canal’s DLO | |||
|
|
||||
| Description: | ||||
| Originally a swing bridge which was removed in 1940 and replaced with a fixed wooden bridge. The abutments were raised to provide the height for boat traffic and the bridge deck installed at an approximate cost of �5000. | ||||
| References: | By Waterway to Taunton by Tony Haskell | |||

