River Tone Structures

Longrun Meadow Footbridge

Bridge Name:   Longrun Meadow Footbridge
No.:   58
Location:   upstream from French Weir
Build Date:   2010
Engineer:    
     
       
 
Description:    
Opened by Mayor of Taunton Deane Jefferson Horsley 27th August 2010

The Meadows, designed by Steve Swan of Swan Paul Partnership

     
References: